Roadmap Collision Detector

Lay multiple project timelines side by side and catch where they collide before it becomes a fire drill.

ProjectsProductivity
Projects (3 of 6)
Wk 0
6 wks
Wk 4
5 wks
Wk 12
4 wks
1 at once

This models the shared resource behind all these timelines — one shared engineer, designer, or team. Most single-owner boards should leave it at 1.

Project A6wProject B5wProject C4w024681012141618202224
Weeks with a resource collisionWeeks over capacity (1 at once)Axis shows week number since project kickoff
Colliding pairs
1 / 3
Total overlapping weeks
2 wks
Overloaded weeks
2 wks
more than 1 at once
Busiest week
Wk 4
2 projects running at once
1 collision found across these timelines
Project A and Project B overlap for 2 weeks (weeks 46).
If these all draw on the same limited resource, something on this board is quietly going to slip.
2 weeks run more projects than your capacity of 1
A collision only matters this much once it actually outstrips what your shared resource can carry at once. See the suggested ordering below for one straightforward way to flatten it.
Suggested feasible ordering
Project A: start week 0 (unchanged)
Project B: suggested start week 6 (currently week 4)
Project C: suggested start week 11 (currently week 12)

Simple greedy scheduling, not full portfolio or resource management: it takes projects in the order listed above, keeps each one's current duration, and places it at the earliest week that doesn't push any week over your capacity of 1. It ignores priority, deadlines, and dependencies entirely — treat this as a starting point to rearrange from, not an optimal plan.

Understand Roadmap Collision Detector

What this tool helps you understand

Add multiple project timelines with their shared resources and deadlines, and see exactly where they overlap or compete — catching a scheduling collision on the plan, not in the middle of the sprint.

When to use it

Use Roadmap Collision Detector when projects and productivity work raises questions about roadmap planner, project timeline collision, and resource overlap planner and you need a concrete view before making the next move.

How to read the result

Use the calculated fit, spacing, timing, or risk as a planning baseline, then verify it against the physical, commercial, or technical constraints of the real project.

Assumptions and limits

Results are estimates based on the entered assumptions. Supplier specifications, team constraints, tolerances, and real-world conditions may require a different final plan.